Project Description
QC & Remedial Work
Situation:
Required to QC 120,000 female military coats for manufacturing faults. These were being advertised during X Factor in 2 days with only 7 hours notice. We were required to frequent Asda’s DCs in Brackmills Northampton, Stoke & Washington Tyneside.
Task:
Arrange skilled operatives at all locations for 8am following morning to undertake the QC work.
Action:
Mobilised 84 operatives to be at the above designated locations for 8am.
Result:
Undertook quality inspection alongside ASDA management team.
11% of the total stock (13,505) were deemed as requiring remedial work therefore arranged ICS transport to arrange hanging garment uplift and taken back to ICS DC
Hired specialised machinery to undertake remedial work and goods returned to DC’s within 7 days.